Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Akin Community Consolidated School District 91
Work covered by the Bid shall include an approx. 3,928 SF building addition with an approx. 230 SF breezeway. a. Demolition work will consist of, but not limited to, the removal of existing exterior finishes, exterior doors, concrete walk, oil and chip drive, excavation for footings and foundations, and earthwork. Refer to the documents for further information. b. Construction will consist of, but not limited to, excavation, termite control, reinforced concrete footings and foundations, concrete slab on grade, EIFS finish system, metal stud walls and partitions, CFS trusses (designed by CFS manufacturer), wood roof deck, adhered membrane roofing system, prefinished aluminum gutters and downspouts, wood doors, hollow metal door and frames, aluminum doors and frames, aluminum windows. Heating, ventilation, electrical and plumbing work. Finishes include painting, acoustical panel ceilings, gypsum board ceilings, LVT floor tile, quartz epoxy floor, wall tile, etc.
Posted Date
Dec 29, 2025
Due Date
Jan 22, 2026
Release: Dec 29, 2025
Akin Community Consolidated School District 91
Close: Jan 22, 2026
Work covered by the Bid shall include an approx. 3,928 SF building addition with an approx. 230 SF breezeway. a. Demolition work will consist of, but not limited to, the removal of existing exterior finishes, exterior doors, concrete walk, oil and chip drive, excavation for footings and foundations, and earthwork. Refer to the documents for further information. b. Construction will consist of, but not limited to, excavation, termite control, reinforced concrete footings and foundations, concrete slab on grade, EIFS finish system, metal stud walls and partitions, CFS trusses (designed by CFS manufacturer), wood roof deck, adhered membrane roofing system, prefinished aluminum gutters and downspouts, wood doors, hollow metal door and frames, aluminum doors and frames, aluminum windows. Heating, ventilation, electrical and plumbing work. Finishes include painting, acoustical panel ceilings, gypsum board ceilings, LVT floor tile, quartz epoxy floor, wall tile, etc.
Akin Community Consolidated School District 91
Purchase a new wheelchair accessible van.
Posted Date
May 8, 2025
Due Date
Jun 20, 2025
Release: May 8, 2025
Akin Community Consolidated School District 91
Close: Jun 20, 2025
Purchase a new wheelchair accessible van.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Akin Community Consolidated School District 91
The board convened for a meeting that included a closed session to discuss collective bargaining, personnel evaluations, employment, and student disciplinary matters. During the public session, the board processed personnel actions for the upcoming school year, specifically approving the rehiring of a bookkeeper, a secretary, a cook, and two paraprofessionals. Additionally, the board formally accepted a staff member's letter of resignation.
The board meeting focused on several key items including the approval of a bid from Miller Construction for bathroom renovations and the hiring of an assistant track coach. The superintendent provided a report covering the selection of an auditor for the upcoming school year, a review of IAR scores, and planning for summer projects, specifically classroom ceiling tile replacements and office bathroom renovations.
The board convened for a closed session to discuss matters related to collective bargaining, personnel evaluation and dismissal, and student disciplinary actions. In new business, the board approved the second reading of various district policies, including those regarding school district governance, board-superintendent relationships, board policy development, chain of command, payment procedures, procurement card usage, pandemic preparedness, student rights, and extracurricular activities. The meeting concluded after hearing the superintendent's report and other board items.
The board meeting included an introduction of the Resource Officer and an update on the building process for new classrooms, specifically covering water, sewer, and electrical components. The board entered a closed session to discuss collective bargaining, personnel matters, and student disciplinary actions. Additionally, the board approved the tentative tax levy and scheduled the corresponding Truth and Taxation hearing. The Superintendent/Principal provided reports regarding school events, including an upcoming Thanksgiving feast and Christmas programs.
The meeting included the hiring of a head track coach and an assistant track coach for the 2025-2026 school year. The board accepted a bid from Evrard Construction for a new addition and conducted a first reading of various board policies concerning school governance, fiscal management, facility operations, staff employment, and student welfare. Additionally, the board held a discussion regarding the planning for the upcoming 2026-2027 school year.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Akin Community Consolidated School District 91's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge