FederalMA
Posted
Nov 5, 2026
Nov 24, 2026
Cooling Tower 2 and 3 Repair RFP
Cooling tower 2 and 3 repair assembly.
Description: The Department of Veterans Affairs plans repairs to Cooling Towers 2 and 3 at the Martinsburg VA Medical Center in West Virginia. The contractor must provide all labor, supervision, travel, equipment, tools, materials, and inspection, with construction estimated at $100,000–$250,000. This is an active presolicitation rather than an issued solicitation, with responses due November 24, 2026, and full solicitation documents not yet publicly available.
Federal · MD, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from 245-Network Contract Office 5 (36C245).
Adjacent opportunities open for bidding right now.
FederalMA
Posted
Nov 5, 2026
Nov 24, 2026
Cooling tower 2 and 3 repair assembly.
PCAC Health Information (36C776)
FederalOH
Posted
Sep 29, 2026
Dec 2, 2026
DESIGN-BUILD: Design-bid-build EHRM Training and Administrative Space Construction project at the Healthcare System. perform upgrades in support of the Electronic Health Record Modernization (EHRM) program. The construction area is located on the first floor of Building 2 and includes both training and administrative spaces. This project includes the execution of Phases 2, 3, and 4 of the associated design plans. Phase 2 addresses the North Training Rooms (Rooms 139, 140, 141, 142), totaling approx.2,000 square feet. Work includes upgraded power and data infrastructure and new flooring and wall finishes. Phase 3 addresses the South Training Rooms (Rooms 126, 127, 128), totaling approximately 1,800 square feet. Work includes upgraded power and data infrastructure and new flooring and wall finishes. Additionally, Phase 3 includes the renovation of a 130-sf breakroom, with new floor and wall finishes, casework, a new sink, and a cold-water tie-in for an ice machine. Phase 4 addresses multiple areas: renovation of an approx. 1,400-square-foot corridor with new floor and wall finishes; upgrades to two offices (approx. 150 SF each) with upgraded power and data infrastructure and new flooring and wall finishes; and upgrades to an existing data closet, including new floor and wall finishes, installation of an additional server rack with associated equipment, and replacement of the existing mini-split HVAC unit.
CityIL
Posted
-
Nov 19, 2026
The structure is a 1,500,000 gallon fluted column elevated water storage tank with a high-water level of 85.5 ft. and a diameter of 86 ft. The work includes: Exterior: Abrasive blast clean to an SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane fluoropolymer system. Wet Interior: Abrasive blast clean to an SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Apply a polyurethane caulk to the roof lap seams. Dry Interior: Abrasive blast clean the spot coating failures throughout to an SSPC-SP6 commercial standard. Apply a spot two (2) coat epoxy system to the prepared surfaces. Pit Piping: Abrasive blast clean to an SSPC-SP6 commercial standard. Apply a two (2) coat epoxy system. Foundation: Abrasive blast clean and apply a two (2) coat epoxy system. Splash Pad: Install a concrete splash pad at the overflow pipe discharge. Cathodic Protection: Install an impressed current cathodic protection system. Repairs: 1)Replace the bowl manway gasket. 2)Install a gasket on the bolted painter’s hatch. 3)Install deflector bars on the fill/draw pipe. 4)Replace the sample tap on the fill/draw pipe. 5)Replace the mud valve. 6)Overflow discharge modification. 7)Install a wet interior ladder. 8)Install a swing gate at the top platform opening. 9)Install a pressure vacuum vent and remove the existing vents. 10)Install a roof handrail with a painter’s railing. 11)Relocate the aviation light to a free-standing mount. 12)Repair damaged electrical junction box. 13)Replace the dry interior light bulbs. 14)Install grounding rods for the structure. 15)Install radar monitoring system. 16)Replace the overhead door.
San Francisco Unified School District
School DistrictCA
Posted
Nov 10, 2026
Nov 17, 2026
Project consists of abatement of existing mechanical chase and thermal system insulation to access hydronic pipe. Replace floor to ceiling hydronic pipe, inspect and pressure test new hydronic pipe. Install new thermal system insulation on uninsulated hydronic pipe. Repair mechanical chase and paint to match existing.