FederalCA
Posted
Jul 17, 2026
Oct 8, 2026
Folsom Warehouse Bridge Crane Replacement
DESIGN BUILD, furnish and install one 30 ton bridge crane to replace the existing bridge crane. Principal Components of work include: Existing crane removal and disposal. Asbestos and other hazardous materials are present. New crane design, fabrication, and installation. New crane power supply up to the main power disconnect. Perform a rail survey and optionally repair or replace existing rail system.
