The University Of Texas At San Antonio
Higher EducationTX
Posted
Aug 28, 2026
Oct 23, 2026
Electrical Power System Study - Request for Proposal
Seeking qualified consultants to provide a complete electrical power system study.
Description: The scope of work includes but is not limited to the following: Setting up protective barrier fencing around project work areas and staging areas with appropriate signs. This fencing shall be temporary chain link fencing 6 FT high. Inspection of the current conditions at the campus. Renting and Staging of back-up generators for the four buildings impacted (1100, 1200, 1800, 2000). Performing de-energizing and lock-out/tag-out procedures per Cal OSHA. Perform cleaning of the switchgear areas to remove spider webs, hornet nests, and wipe down the area to clean out the switchgear. Tie-in the back-up generators and test to verify no issues with connections. Then, start-up the generators and verify with College M & O that there are not any operational impacts to building systems and everything is powered. Testing as needed. Demolition of the existing 12,000 volt conductors. Inspection of the existing conduit, possibly requiring a camera to inspect and determine if the existing conduit needs to be replaced. Possibly replacing the existing conduit. Separate line item cost. Installation of the new conductors. Add labeling as needed. De-energizing the generators and making new conductor connections. Testing of the new conductors and generation of testing reports. Energizing the new conductors.
HigherEducation · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
The University Of Texas At San Antonio
Higher EducationTX
Posted
Aug 28, 2026
Oct 23, 2026
Seeking qualified consultants to provide a complete electrical power system study.
Suny Schenectady County Community College
Higher EducationNY
Posted
Sep 29, 2026
Oct 29, 2026
The selected vendor will be responsible for providing a turnkey cloud-hosted (UCaaS) or hybrid unified communications solution to replace the existing telephony environment across multiple academic and administrative campus buildings. Key project components include the replacement of the existing on-premises phone system, migration to SIP-based calling, native integration with Microsoft Teams as the primary user interface, and provisioning of physical Power over Ethernet (PoE) desk phones, softphones, and mobile calling options. The solution requires full compliance with federal, state, and local E911 regulations—including Kari's Law and the RAY BAUM's Act—with dynamic location tracking down to the building, floor, and room level. Additional project deliverables encompass system configuration, testing, cutover, number porting, user and administrator training, complete knowledge transfer, and ongoing maintenance, support, and service-level commitments.
Suny Schenectady County Community College
Higher EducationNY
Posted
Sep 29, 2026
Oct 29, 2026
The selected vendor will be responsible for providing a turnkey cloud-hosted (UCaaS) or hybrid unified communications solution to replace the existing telephony environment across multiple academic and administrative campus buildings. Key project components include the replacement of the existing on-premises phone system, migration to SIP-based calling, native integration with Microsoft Teams as the primary user interface, and provisioning of physical Power over Ethernet (PoE) desk phones, softphones, and mobile calling options. The solution requires full compliance with federal, state, and local E911 regulations—including Kari's Law and the RAY BAUM's Act—with dynamic location tracking down to the building, floor, and room level. Additional project deliverables encompass system configuration, testing, cutover, number porting, user and administrator training, complete knowledge transfer, and ongoing maintenance, support, and service-level commitments.
CityGA
Posted
Sep 14, 2026
Oct 23, 2026
Design, furnish, and install audio/visual (A/V) system upgrades for the existing City Hall Council Chambers.
Decision makers connected to this RFP from Yuba Community College District.