Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
CMAR project - North-side secondary project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project will include the installation of approx 198 secondary water connections throughout the area of the city.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
The project will include the installation of approx 198 secondary water connections throughout the area of the city.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of dewatering the water reclamation facility's aeration basin, further excavation and installation of a new concrete aeration basin facility with a flow splitting structure, air lines, diffusers, a mixing system, a surface wasting pumping system, and a high flow return pump connected to the adjacent high flow storage pond. In conjunction with the new aeration basin, a new blower building with internal blowers will be constructed with a separate electrical control building. Additional work includes a separate carbon feed building with internal tanks and chemical metering pumps, a below grade secondary clarifier weir flow splitting structure, and relocation of a concrete sand filter high flow diversion structure.
Posted Date
Dec 17, 2025
Due Date
Mar 3, 2026
Release: Dec 17, 2025
Close: Mar 3, 2026
The work consists of dewatering the water reclamation facility's aeration basin, further excavation and installation of a new concrete aeration basin facility with a flow splitting structure, air lines, diffusers, a mixing system, a surface wasting pumping system, and a high flow return pump connected to the adjacent high flow storage pond. In conjunction with the new aeration basin, a new blower building with internal blowers will be constructed with a separate electrical control building. Additional work includes a separate carbon feed building with internal tanks and chemical metering pumps, a below grade secondary clarifier weir flow splitting structure, and relocation of a concrete sand filter high flow diversion structure.
AvailableWork includes HVAC work.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Work includes HVAC work.
AvailableThe Centre de services scolaire de la Côte-du-Sud is seeking secondary school teachers for various subjects including special education, English, mathematics, personal orientation project, and well-being, across multiple schools and contract durations.
Posted Date
-
Due Date
Jun 24, 2026
Close: Jun 24, 2026
The Centre de services scolaire de la Côte-du-Sud is seeking secondary school teachers for various subjects including special education, English, mathematics, personal orientation project, and well-being, across multiple schools and contract durations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →