CityNC
Posted
Nov 6, 2026
Dec 3, 2026
Site Preparation for Pre-Construction Utility Relocation Services (Request for Proposal)
Provide site preparation for pre-construction utility relocation services.
Description: Pre-Proposal Site Visit
Federal · CO, US
Adjacent opportunities open for bidding right now.
CityNC
Posted
Nov 6, 2026
Dec 3, 2026
Provide site preparation for pre-construction utility relocation services.
FederalOK
Posted
Oct 20, 2026
Dec 10, 2026
The Air Force Sustainment Center’s active Sources Sought notice concerns decommissioning, removing, and disposing of one Quintus ABB QFC 1.6 x 4-1400 fluid cell press at Robins Air Force Base. The work includes dismantling and rigging the equipment, moving its components for cutting or off-base transport, and removing resulting scrap and debris. Responses are due December 10, 2026, at 4:00 PM EST; this is a procurement notice, not a grant.
Posted
Oct 20, 2026
Dec 10, 2026
The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB. Upper Filler Piece: 64,000 lbs; Pressure Plate: 32,000 lbs; Lower Filler Piece: 86,000 lbs; Unwound Main Cylinder: 148,000 lbs; Plating attached to Lower Filler: 7,000 lbs (see Performance Work Statement for full details)
FederalOK
Posted
Oct 20, 2026
Dec 10, 2026
The Air Force Sustainment Center’s active Sources Sought notice concerns decommissioning, removing, and disposing of one Quintus ABB QFC 1.6 x 4-1400 fluid cell press at Robins Air Force Base. The work includes dismantling and rigging the equipment, moving its components for cutting or off-base transport, and removing resulting scrap and debris. Responses are due December 10, 2026, at 4:00 PM EST; this is a procurement notice, not a grant.
Decision makers connected to this RFP from DSC Contracting Services Division.
Original attachments and procurement documents tied to this bid.