Closing soon

Site Visit - Removal of Old Fluid Cell

Description: The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB. Upper Filler Piece: 64,000 lbs; Pressure Plate: 32,000 lbs; Lower Filler Piece: 86,000 lbs; Unwound Main Cylinder: 148,000 lbs; Plating attached to Lower Filler: 7,000 lbs (see Performance Work Statement for full details)

Released
Oct 20, 2026
Closes
Dec 10, 2026(13 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts