CityAR
Posted
Oct 30, 2026
Dec 3, 2026
Melbourne WWTP Improvements RFP
Work may include, but is not necessarily limited to, the following: 1. the furnishing & installation of a packaged complete headworks plant, that includes perforated basket fine screening and aerated grit removal, with associated conveyors, and control panels, 2. the construction of an influent splitter box to automatically divert wet-weather flows 3. the replacement of a 10” flanged mag-meter 4. the furnishing & installation of oxidation ditch aeration improvements 5. the furnishing & installation of wet-weather pile cloth media filters 6. the furnishing & installation of non-contact UV disinfection equipment 7. the construction of a PEMB building housing the filter & UV equipment 8. the furnishing & installation of polymer feed improvements 9. the furnishing & installation of all yard piping 10. mobilization and demobilization 11. clearing, grubbing, earthwork, seeding, and erosion control 12. select demolition of piping and equipment 13. site grading 14. electrical and controls work, including new 480 V - 3 phase service 15. the furnishing and installation of a backup generator 16. miscellaneous appurtenances 17. safety systems 18. items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be considered included in the lump sum price.
