CityNC
Posted
-
Nov 18, 2026
Repair of Final Clarifier #3 at the Westside WWTP RFP
Provide comprehensive surface preparation and recoating services for the 1. 8 million-gallon (mg) final clarifier #3.
Description: This project involves the removal and replacement of the existing 35' clarifier mechanism.
City · TX, US
Adjacent opportunities open for bidding right now.
CityNC
Posted
-
Nov 18, 2026
Provide comprehensive surface preparation and recoating services for the 1. 8 million-gallon (mg) final clarifier #3.
CityAR
Posted
Oct 30, 2026
Dec 3, 2026
Work may include, but is not necessarily limited to, the following: 1. the furnishing & installation of a packaged complete headworks plant, that includes perforated basket fine screening and aerated grit removal, with associated conveyors, and control panels, 2. the construction of an influent splitter box to automatically divert wet-weather flows 3. the replacement of a 10” flanged mag-meter 4. the furnishing & installation of oxidation ditch aeration improvements 5. the furnishing & installation of wet-weather pile cloth media filters 6. the furnishing & installation of non-contact UV disinfection equipment 7. the construction of a PEMB building housing the filter & UV equipment 8. the furnishing & installation of polymer feed improvements 9. the furnishing & installation of all yard piping 10. mobilization and demobilization 11. clearing, grubbing, earthwork, seeding, and erosion control 12. select demolition of piping and equipment 13. site grading 14. electrical and controls work, including new 480 V - 3 phase service 15. the furnishing and installation of a backup generator 16. miscellaneous appurtenances 17. safety systems 18. items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be considered included in the lump sum price.
CityOH
Posted
-
Nov 17, 2026
Work includes water treatment plant clarifier improvements. Project consist of rehabilitating and repairing the two existing lime softening clarifiers. The work will include replacing mechanical drives, corroded steel, painting, and other related components.
Porter-Tower Joint Municipal (Sewer) Authority
Special DistrictPA
Posted
Oct 30, 2026
Dec 16, 2026
Project generally consists of the addition of a new influent wet well Jockey pump with Variable Frequency Drive in the Operations building. Work includes piping, panel modification, process instrumentation and SCADA integration, as specified herein and as shown on the Drawings consisting of demolition, structural, process mechanical, electrical demolition and electrical.
Decision makers connected to this RFP from Town of Idalou.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
The City Council discussed the WWTP clarifier condition assessment and repair options but took no action.
Discussion and Possible Action Regarding the Wastewater Treatment Plant Clarifier. Including an Update on the Condition Assessment, Consideration of Repair Options, and Possible Authorization of Repairs and Use of Reserve Funds: Oscar updated the Council on condition. This was a no action item
Idalou City Council Regular Meeting
Board meeting · Jul 13, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (12 days left)