Porter-Tower Joint Municipal (Sewer) Authority
Special DistrictPA
Posted
Oct 30, 2026
Dec 16, 2026
WWTP Influent Pump Improvements RFP
Project generally consists of the addition of a new influent wet well Jockey pump with Variable Frequency Drive in the Operations building. Work includes piping, panel modification, process instrumentation and SCADA integration, as specified herein and as shown on the Drawings consisting of demolition, structural, process mechanical, electrical demolition and electrical.
