Jamestown Board of Public Utilities
Special DistrictNY
Jul 27, 2026
Closes
Aug 13, 2026
Renovation of the Sprague Street Wastewater Lift Station (Request for Proposal)
Provide renovation of the lift station includes removal of the two existing pumps and supply and install two new submersible pumps matching their specifications. The contractor shall supply and install new stainless steel pump guide rails. The contractor shall supply and install two vacuum breakers, two check valves, two discharge valves and all piping contained in the valve pit. The contractor shall provide and install a flow meter. The contractor shall provide and install a complete control panel for the pumps.