CityFL
Posted
Aug 25, 2026
Sep 29, 2026
Lift Station 23 Rehabilitation and Force Main
Work includes approx 0.30 AC clearing and grubbing; 100 LF of 8" HDPE SDR11 sewer force main (directional bore); 3,000 SY sodding; 100 LF of 6' fencing.
Description: Project is to rehabilitate portions of the griffith dry-weather force main, install new connection manhole, inspect the remaining concrete portion of the force main and replace if conditions are deemed poor.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityFL
Posted
Aug 25, 2026
Sep 29, 2026
Work includes approx 0.30 AC clearing and grubbing; 100 LF of 8" HDPE SDR11 sewer force main (directional bore); 3,000 SY sodding; 100 LF of 6' fencing.
Troop Support Clothing and Textiles
FederalPA
Posted
Oct 28, 2025
Oct 28, 2026
Air force temperate weather boot,Lend NSN(s): 8430-01-675-8255 (Men's) & 8435-01-675-7941(Women's) requirement for Boot, Men's & Women's, Coyote, Temperate Weather, Air Force (PGC's 03944 & 03945). The boot shall be in the following whole and half sizes and widths: 5 through 9 inclusive and whole sizes 4, 10 and 11 quantity is 11,464 pairs.
FederalPA
Posted
Oct 28, 2025
Oct 28, 2026
DLA Troop Support seeks men's and women's coyote temperate-weather Air Force boots under PGCs 03944 and 03945. The boots must be manufactured according to Product Descriptions PD-77AESG-06-01A for men's boots and PD-77AESG-06-03A for women's boots, both dated 29 June 2018. The active SAM.gov presolicitation was posted on October 28, 2025, and responses are due October 28, 2026; it is identified as a contract opportunity rather than a grant.
CityTX
Posted
Aug 20, 2026
Sep 24, 2026
Construction of 23rd street lift station force main rehabilitation and supplemental improvements includes install temporary erosion, sedimentation, and environmental controls, complete in place; 60 LF of trench excavation protection (all depths), including a pe stamped trench safety plan; barricades, signs, and traffic handling; groundwater control for all open cut excavation operations, complete in place; 75 lf of remove and dispose of existing concrete curb, as shown on the plans; remove and dispose of remaining driveway section, as called out on the plan set; full depth 6 inch concrete driveway construction with 6" of compacted subgrade, to match existing driveway profile and limits; 80 LF of replacement of concrete curb to match existing type, dimensions, and profile, complete in place; remove and replace existing 8 security fence and posts per plans and details. See outside link.
Decision makers connected to this RFP from San Francisco Public Utilities Commission.