Closing soon

WTRBA Central Creek Pedestrian Bridge - UPDATED RFP

Description: The State of Tennessee is seeking a contractor for the West Tennessee River Basin Authority to design, fabricate, and install a 55-foot-long by 6-foot-wide pedestrian bridge over Central Creek in Jackson. The bridge must use existing abutments and connect with the existing trail, and a Tennessee-licensed engineer must design the bridge and oversee its fabrication and installation. The ITB calls for one contract, awarded to the lowest-cost responsive bid meeting its requirements.

Released
Nov 3, 2026
Closes
Dec 4, 2026(12 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts