Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Methuen, Massachusetts, is soliciting bids for the rehabilitation of four high lift Vertical Turbine Pumps at the Water Treatment Plant (WTP) located at 25 Burnham Rd., Methuen, MA 01844. Bidders must provide a certified or cashier’s check or bid bond of five percent (5%) and the successful bidder must furnish 100 percent Construction Performance and Payment Bonds; bidders must comply with M.G.L., Chapter 149, Sections 26 to 27D (prevailing wage). The contract work is expected to be completed by February 9, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of a vertical turbine pump replacement service for the Water Treatment Plant, including removal of the existing pump and installation of a new vertical turbine pump.
Posted Date
-
Due Date
Feb 13, 2026
Close: Feb 13, 2026
Procurement of a vertical turbine pump replacement service for the Water Treatment Plant, including removal of the existing pump and installation of a new vertical turbine pump.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Campbell County Utilities and Service Authority issued an Invitation for Bids for the Otter River Water Treatment Plant finished water pump upgrades, covering piping and pump installation, motor control center (MCC) replacement, and related work at the Otter River WTP in Evington, VA. An optional pre-bid conference is scheduled for 2:00 PM on January 29, 2026 at the Otter River WTP (9625 Leesville Rd, Evington, VA 24550). Bids are due on February 12, 2026; the solicitation is a construction IFB and is open as of January 24, 2026.
Posted Date
Jan 23, 2026
Due Date
Feb 12, 2026
Release: Jan 23, 2026
Close: Feb 12, 2026
The Campbell County Utilities and Service Authority issued an Invitation for Bids for the Otter River Water Treatment Plant finished water pump upgrades, covering piping and pump installation, motor control center (MCC) replacement, and related work at the Otter River WTP in Evington, VA. An optional pre-bid conference is scheduled for 2:00 PM on January 29, 2026 at the Otter River WTP (9625 Leesville Rd, Evington, VA 24550). Bids are due on February 12, 2026; the solicitation is a construction IFB and is open as of January 24, 2026.
AvailablePalm Beach County Water Utilities Department is soliciting bids for rehabilitation of ten Upper Floridan Aquifer production wells at Water Treatment Plant No. 11 in Belle Glade, Florida. The scope includes mobilization, removal/reinstallation of wellhead and column pipe, pump/motor work, video inspections, geophysical logging, performance and post-rehabilitation testing, acid treatment, formation water disposal, electrical work, and site restoration; the project duration is approximately 450 days. This is an Invitation for Bid (IFB) procurement (not a grant), open from 2026-01-20 through 2026-02-17.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
Palm Beach County Water Utilities Department is soliciting bids for rehabilitation of ten Upper Floridan Aquifer production wells at Water Treatment Plant No. 11 in Belle Glade, Florida. The scope includes mobilization, removal/reinstallation of wellhead and column pipe, pump/motor work, video inspections, geophysical logging, performance and post-rehabilitation testing, acid treatment, formation water disposal, electrical work, and site restoration; the project duration is approximately 450 days. This is an Invitation for Bid (IFB) procurement (not a grant), open from 2026-01-20 through 2026-02-17.
AvailablePerform rehabilitation of up to ten (10) upper floridan aquifer production wells (TP-1, TP-2, PW-3, PW-4, PW-5, PW-6, PW-7, PW-8, PW-10, and PW-11).
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
Perform rehabilitation of up to ten (10) upper floridan aquifer production wells (TP-1, TP-2, PW-3, PW-4, PW-5, PW-6, PW-7, PW-8, PW-10, and PW-11).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →