Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Campbell County Utilities and Service Authority issued an Invitation for Bids for the Otter River Water Treatment Plant finished water pump upgrades, covering piping and pump installation, motor control center (MCC) replacement, and related work at the Otter River WTP in Evington, VA. An optional pre-bid conference is scheduled for 2:00 PM on January 29, 2026 at the Otter River WTP (9625 Leesville Rd, Evington, VA 24550). Bids are due on February 12, 2026; the solicitation is a construction IFB and is open as of January 24, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the construction of a finished water main between the Russellville Water Treatment Plant and the City System, and site piping at the Cemetery Tank.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
This RFP is for the construction of a finished water main between the Russellville Water Treatment Plant and the City System, and site piping at the Cemetery Tank.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a finished water main between the Russellville Water Treatment Plant and the existing water system network, including site piping at the Cemetery Tank.
Posted Date
-
Due Date
Feb 5, 2026
Release: -
Close: Feb 5, 2026
Construction of a finished water main between the Russellville Water Treatment Plant and the existing water system network, including site piping at the Cemetery Tank.
AvailableThe Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
Posted Date
Dec 5, 2025
Due Date
Jan 29, 2026
Release: Dec 5, 2025
Close: Jan 29, 2026
The Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
AvailableThis solicitation requests construction and site/electrical work to upgrade solids processing at the Stickney Water Treatment Plant, including a new 110-foot diameter clarifier/thickener, an elevated splitter box, and a new sludge pump station. The project also involves demolition of the existing station, yard piping, paving, grading, stormwater improvements, and electrical/controls upgrades. Issued by the City of Moore on behalf of the Stickney WTP, the estimated value ranges from $50,000,000 to $100,000,000 with a response deadline in early February 2026.
Posted Date
Dec 31, 2025
Due Date
Feb 2, 2026
Release: Dec 31, 2025
Close: Feb 2, 2026
This solicitation requests construction and site/electrical work to upgrade solids processing at the Stickney Water Treatment Plant, including a new 110-foot diameter clarifier/thickener, an elevated splitter box, and a new sludge pump station. The project also involves demolition of the existing station, yard piping, paving, grading, stormwater improvements, and electrical/controls upgrades. Issued by the City of Moore on behalf of the Stickney WTP, the estimated value ranges from $50,000,000 to $100,000,000 with a response deadline in early February 2026.