CityIA
-
Closes
Sep 29, 2026
WRF Building 75 Boilers and Heat Loop Improvements
The Des Moines Metropolitan Wastewater Reclamation Authority is seeking bids for phased replacement of boilers, heat-loop equipment, piping, controls, electrical systems, and related appurtenances at the Wastewater Reclamation Facility. The work covers Buildings 75, 90, 801, 802, and 803 at 3000 Vandalia Road in Des Moines, Iowa, and must maintain heat-loop operations during construction. The engineer’s estimate is $9,095,000, bids are due September 29, 2026, and the project is funded through WRA Series 2024B Bond Proceeds; this is a construction invitation for bid, not a grant program.