Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Common Excavation 16,500 CY, 8” PVC Sanitary, 1,500 LF, Common Embankment, 9,000 CY, Sanitary Manhole, 5 EA, Drainable Aggregate Base, 1,000 CY, Storm Catch Basin, 8 EA, Aggregate Base Class 5, 1,500 CY, Storm Manhole, 3 EA, 4” Perf. Subsurface Drain, 2,500 LF, 12”-36” RCP Storm Sewer, 1,200 LF, Concrete Curb & Gutter, 2,500 LF, Wet Sedimentation Pond, 1 EA Concrete Walk, 16,000 SF, 10” PVC Water Main, 1,300 LF, Concrete Driveway, 200 SY, Water Gate Valve Manhole, 3 EA, Bituminous Pavement, 1,600 TON, Turf Establishment, 15,000 SY, Concrete Pavement (Alternate), 4,400 SY, together with numerous related items of work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
120 CY, excavation - common (EV) (P); 20 CY, excavation - rock (EV); 1ea, 2'x3' catch basin; 1 ea, 4' dia catch basin manhole w/3' sump; 51 LF, 18" RC pipe; 370 CY, granular backfill (CV) (P); 80 TN, aggregate base, class 5; 60 SY, type sp 9.5 wearing course mixture - street; 80 SY, type SP 12.5 wearing course mixture - driveway; 65 LF; 4' chain link fence - black vinyl coated; 1,070 SF, modular block retaining wall; 90 LF, guardrail; 1,083 LF, cured in place pipe lining; 1 LS, sanitary bypass; 1 LS, lift station #2.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
120 CY, excavation - common (EV) (P); 20 CY, excavation - rock (EV); 1ea, 2'x3' catch basin; 1 ea, 4' dia catch basin manhole w/3' sump; 51 LF, 18" RC pipe; 370 CY, granular backfill (CV) (P); 80 TN, aggregate base, class 5; 60 SY, type sp 9.5 wearing course mixture - street; 80 SY, type SP 12.5 wearing course mixture - driveway; 65 LF; 4' chain link fence - black vinyl coated; 1,070 SF, modular block retaining wall; 90 LF, guardrail; 1,083 LF, cured in place pipe lining; 1 LS, sanitary bypass; 1 LS, lift station #2.
AvailableSealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Sealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
AvailableThe City of Cumberland is soliciting bids for the Mechanic Street and Harrison Street Intersection Improvements (City Project 2024-06-PVG), covering sidewalk, paving, crosswalk upgrades and installation of a new traffic signal. A mandatory pre-bid meeting is scheduled for 2025-11-20; bids close on 2025-12-17 and the project requires Performance and Payment Bonds.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
The City of Cumberland is soliciting bids for the Mechanic Street and Harrison Street Intersection Improvements (City Project 2024-06-PVG), covering sidewalk, paving, crosswalk upgrades and installation of a new traffic signal. A mandatory pre-bid meeting is scheduled for 2025-11-20; bids close on 2025-12-17 and the project requires Performance and Payment Bonds.
The City of Louisville, Georgia is seeking proposals for the construction of roadway and drainage improvements on Jewell Lane and Second Street. The project includes a double headwall for 36" storm pipes, asphalt overlay, 37 L.F. of 24" RCP storm pipe, a storm manhole, traffic control, rip rap, and soil erosion and sediment control. Bidders must have a State of Georgia Contractor License and provide a Bid Bond of at least 5% of the bid amount.
Posted Date
-
Due Date
Dec 15, 2025
Close: Dec 15, 2025
The City of Louisville, Georgia is seeking proposals for the construction of roadway and drainage improvements on Jewell Lane and Second Street. The project includes a double headwall for 36" storm pipes, asphalt overlay, 37 L.F. of 24" RCP storm pipe, a storm manhole, traffic control, rip rap, and soil erosion and sediment control. Bidders must have a State of Georgia Contractor License and provide a Bid Bond of at least 5% of the bid amount.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis