Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
120 CY, excavation - common (EV) (P); 20 CY, excavation - rock (EV); 1ea, 2'x3' catch basin; 1 ea, 4' dia catch basin manhole w/3' sump; 51 LF, 18" RC pipe; 370 CY, granular backfill (CV) (P); 80 TN, aggregate base, class 5; 60 SY, type sp 9.5 wearing course mixture - street; 80 SY, type SP 12.5 wearing course mixture - driveway; 65 LF; 4' chain link fence - black vinyl coated; 1,070 SF, modular block retaining wall; 90 LF, guardrail; 1,083 LF, cured in place pipe lining; 1 LS, sanitary bypass; 1 LS, lift station #2.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Pelham, Alabama is soliciting sealed proposals for construction improvements to the Eagle Cove sanitary sewer lift station. The project entails rehabilitation and upgrade work to the lift station and associated appurtenances, delivered as a public works construction contract. Bids are due to the City by January 8, 2026 at 2:00 PM local time.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
The City of Pelham, Alabama is soliciting sealed proposals for construction improvements to the Eagle Cove sanitary sewer lift station. The project entails rehabilitation and upgrade work to the lift station and associated appurtenances, delivered as a public works construction contract. Bids are due to the City by January 8, 2026 at 2:00 PM local time.
AvailableWork include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
Close: Dec 18, 2025
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
The project generally consists of, but is not necessarily limited to, the following major items: construction of new lift station and decommissioning of existing lift station utilizing owner furnished pumps and piping appurtenances.
Posted Date
Dec 2, 2025
Due Date
Dec 19, 2025
Release: Dec 2, 2025
Close: Dec 19, 2025
The project generally consists of, but is not necessarily limited to, the following major items: construction of new lift station and decommissioning of existing lift station utilizing owner furnished pumps and piping appurtenances.
AvailableWork includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis