Closing soon

Woodlawn TACC Elevator Maintenance (Request for Quote)

Description: Scope of work: replace all hydraulic oil fluid within machine room reservoir tank with new AW- 32blend with additives for lubrication. Clean machine room reservoir. Clean machine room reservoir tank of all debris and oil breakdown sludge. Remove existing hydraulic control leveling valve. Remove existing hydraulic control leveling valve & send to repair shop to rebuild, clean and service all moving parts. Reinstall same existing hydraulic control leveling valve and test with weights for full load capacity testing. Replace existing old victaulic fittings within machine room hydraulic reservoir tank & Returned elevator to working order. See attached files and outside link.

Buyer
Released
Aug 24, 2026
Closes
Sep 8, 2026(12 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts