CityNY
Aug 11, 2026
Closes
Sep 10, 2026
Elevator Rehabilitation At Straus and Rutgers (Request for Quotation)
Elavator rehabilitation and maintenance and service at straus and rutgers development.
Description: Work includes removal and replacement of existing elevator systems and the furnishing and installation of new elevator equipment, including machines, controls, hoistway components, car enclosures, doors, communication systems, safety devices, and associated electrical components. The work also includes testing, inspection, commissioning, training, and coordination with NYCHA and other trades, including a separate electrical contract.
SpecialDistrict · NY, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CityNY
Aug 11, 2026
Closes
Sep 10, 2026
Elavator rehabilitation and maintenance and service at straus and rutgers development.
Ohio Adjutant General's Department
State AgencyOH
Aug 24, 2026
Closes
Sep 8, 2026
Scope of work: replace all hydraulic oil fluid within machine room reservoir tank with new AW- 32blend with additives for lubrication. Clean machine room reservoir. Clean machine room reservoir tank of all debris and oil breakdown sludge. Remove existing hydraulic control leveling valve. Remove existing hydraulic control leveling valve & send to repair shop to rebuild, clean and service all moving parts. Reinstall same existing hydraulic control leveling valve and test with weights for full load capacity testing. Replace existing old victaulic fittings within machine room hydraulic reservoir tank & Returned elevator to working order. See attached files and outside link.
West Virginia Department of Administration
State AgencyWV
Jul 22, 2026
Closes
Sep 3, 2026
Modernization of fifteen (15) elevators in buildings 1, 3, 6 and 13.
Aug 2, 2026
Closes
Sep 22, 2026
Rental rehabilitation project. Install new shingle roof and TPO flat roof (TPO Roof is 575 SF) allow for wood rot. Supply & Install New hurricane rated sliders door - Therma-Tru or Jeld-Wein. Install new Carrier HVAC 2 Ton units with minimum rating of 15 SEER, including replacement of Thermostat. Repairs to cracks in Patio/Pool Deck Area. Coordinate and provide professional scoping report of sanitary lines. Pressure wash all patio areas and entire house. Re-seal asphalt pavement. Interior sheetrock repair and re-paint as needed. Replace Electrical panel and provide report for any additional electrical wiring deficiencies. Remove existing flooring and Install new LVP flooring 8MM, Walnut.
Procurement and program contacts connected to New York City Housing Authority.