Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project consists of walking paths with lighting, an amphitheater with seat walls, and an events lawn. Work includes grading, erosion and sediment control as well as utility relocation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the removal and replacement of existing lighting track on the first-floor exhibition space of the Mulvane Art Museum.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
Procurement for the removal and replacement of existing lighting track on the first-floor exhibition space of the Mulvane Art Museum.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for Roofing, Painting, and Electrical work related to Upper Campus Roof Replacement and Multi-Campus Improvements.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
This RFP is for Roofing, Painting, and Electrical work related to Upper Campus Roof Replacement and Multi-Campus Improvements.
AvailableCR 214 (King Street) and N Volusia Street Intersection Improvements
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
CR 214 (King Street) and N Volusia Street Intersection Improvements
AvailableThis project consists of, but is not limited to, removal and replacement of the grand staircase top tier. cope includes perimeter waterproofing, encompassing excavation, waterproofing application, and backfill in accordance with project specifications. The north exterior stair and adjacent spaces are to be removed, with new masonry wall infill, foundation waterproofing, and drainage improvements for the storage area. Additional subgrade and exterior work shall be completed as shown in the drawings and described in the specifications. Work also includes recommissioning of mechanical systems as well as mechanical upgrades/ repairs on existing equipment. Alternate work scopes include, but is not limited to, limestone and brick veneer restoration, window and exterior door replacement, and lower-level egress stair modifications
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
This project consists of, but is not limited to, removal and replacement of the grand staircase top tier. cope includes perimeter waterproofing, encompassing excavation, waterproofing application, and backfill in accordance with project specifications. The north exterior stair and adjacent spaces are to be removed, with new masonry wall infill, foundation waterproofing, and drainage improvements for the storage area. Additional subgrade and exterior work shall be completed as shown in the drawings and described in the specifications. Work also includes recommissioning of mechanical systems as well as mechanical upgrades/ repairs on existing equipment. Alternate work scopes include, but is not limited to, limestone and brick veneer restoration, window and exterior door replacement, and lower-level egress stair modifications
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →