Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for providing chemical and water treatment services for the HVAC system at Westmoreland Manor, including maintaining water treatment programs, supplying chemicals, and calibrating associated equipment for steam boilers, hot water loops, chilled water loops, and cooling towers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide chemical water treatment services.
Posted Date
Dec 5, 2025
Due Date
Feb 12, 2026
Release: Dec 5, 2025
Close: Feb 12, 2026
Provide chemical water treatment services.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish & installation of a new Hydrous Manganese Oxide (HMO) chemical feed system located within the existing Shorrock Street Water Treatment Plant. The work will include but is not limited to the demolition and preparation required, installation of a new containment curb, FRP grating system, chemical tote load cell devices, HDPE batch tanks, chemical transfer pumps, chemical metering pumps, all associated suction and discharge piping, valving and appurtenances, emergency safety shower, all instrumentation and control equipment and features, electrical modifications, HVAC modifications, fire protection system modifications, and plumbing modifications necessary for a complete working chemical feed system. Demolition of, and modifications to, the existing packed column aeration system at the Shorrock Street Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility. Demolition of, and modifications to, the existing packed column aerator system at the New Hampshire Avenue Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility.
Posted Date
Jan 15, 2026
Due Date
Feb 25, 2026
Release: Jan 15, 2026
Close: Feb 25, 2026
Furnish & installation of a new Hydrous Manganese Oxide (HMO) chemical feed system located within the existing Shorrock Street Water Treatment Plant. The work will include but is not limited to the demolition and preparation required, installation of a new containment curb, FRP grating system, chemical tote load cell devices, HDPE batch tanks, chemical transfer pumps, chemical metering pumps, all associated suction and discharge piping, valving and appurtenances, emergency safety shower, all instrumentation and control equipment and features, electrical modifications, HVAC modifications, fire protection system modifications, and plumbing modifications necessary for a complete working chemical feed system. Demolition of, and modifications to, the existing packed column aeration system at the Shorrock Street Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility. Demolition of, and modifications to, the existing packed column aerator system at the New Hampshire Avenue Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility.
AvailableSeeks proposals to finalize an agreement for HVAC water treatment services for the property management, water, and public events departments on an ongoing basis.
Posted Date
Dec 17, 2025
Due Date
Feb 5, 2026
Release: Dec 17, 2025
Close: Feb 5, 2026
Seeks proposals to finalize an agreement for HVAC water treatment services for the property management, water, and public events departments on an ongoing basis.
AvailableProvide chemical water treatment services for our cooling tower and heat systems, and cooling tower cleaning.
Posted Date
Jan 14, 2026
Due Date
Feb 6, 2026
Release: Jan 14, 2026
Close: Feb 6, 2026
Provide chemical water treatment services for our cooling tower and heat systems, and cooling tower cleaning.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →