CityWA
Posted
-
Dec 9, 2026
Description: Furnish all labor, transportation, and services, including fuel, power, water, and essential communications; and performing all work or other operations required to replace weight scales in both bays with concrete deck scales and coating system. The project will be completed in two phases, one for each bay. Solids containment is required after regular working hours and on weekends in the truck bay under construction so that dewatered biosolids can be contained. Anticipated volume and weight of biosolids estimated to be 3.5 CY and 5.000 lbs, respectively. Four spare load cells are to be provided, two for each bay.Cleaning and maintenance of load cell pit to be performed as necessary prior to installing new scale decks. Work will take place within an operating wastewater treatment facility. Subcontracting opportunities include: Project management; mobilization and demobilization; demolition and disposal.
County · WA, US
Decision makers connected to this RFP from King County.
From the first pre-RFP signals to the published RFP and its files.
Proposed budget
418 days before RFP
King County’s Executive Proposed 2026-2027 budget lists $992,000 for Water Quality Capital Outlay to support potential plant capital-equipment acquisitions and replacement cost estimates, including vendor contracts.
CAP Summary by Fund Budget: 2026-2027 Biennial Budget, Scenario: Executive Proposed, Agency: Wastewater Treatment, Fund: 3611 WATER QUALITY CONSTRUCTION, Cap Status: Approved, Is IT Proj? Both Yes and No 2026-2027 Biennial Budget - Executive Proposed 3611 WATER QUALITY CONSTRUCTION - Wastewater Treatment Project Number Project Name Class Code Tech Adj…
King County FY2026-27 Proposed Budget
Proposed budget · Sep 17, 2025
RFP published
Proposals due (19 days left)
Adjacent opportunities open for bidding right now.
CityWA
Posted
-
Dec 9, 2026
Construct a new wastewater treatment plant adjacent to the existing wastewater treatment plant utilizing a packaged treatment system with new structural concrete basins, a new headworks screen and channel, a new wastewater lift station, a new Laboratory/Operations building with UV disinfection channels, new concrete formed biosolids dewatering beds, a new outfall pipe and all associated appurtenances and requirements for a fully functional wastewater treatment plant.
CityMO
Posted
Oct 8, 2206
Dec 3, 2026
The Southwest Wastewater Treatment Plant (SWTP) Centrifuge Replacement consists of the replacement of three (3) dewatering centrifuges, replacement of an inclined belt conveyor, digester mixing improvements for one anaerobic digester, miscellaneous sludge handling equipment to support the centrifuge replacement, and control room improvements.
CityCT
Posted
Oct 30, 2026
Dec 2, 2026
This project consists of the construction of one (1) 50-foot diameter secondary clarifier tank and mechanism, relocation of yard piping to facilitate the installation of the secondary tank, manholes, distribution box with slide gates, yard piping, valves, and appurtenances for complete and operational secondary clarifier tank. Additionally, the waterproofing of the RAS/WAS pump station inclusive of louver and exhaust fan relocations with brick infill of the existing locations and floodproof doors. This project also consists of three (3) bid alternates. Bid Alternate No. 1 consists of RAS/WAS pump station upgrades inclusive of RAS/WAS pumps, flow meters, process valves, piping, fitting, pipe supports, and appurtenances replacement. Bid Alternate No. 2 consists of minor RAS/WAS pump station upgrades inclusive of flow meters and process valve replacements. Bid Alternate No. 3 consists of the removal and proper disposal of the existing two (2) 30-foot diameter secondary clarifier tanks, distribution box, and yard piping as indicated. Additionally, it will consist of the construction of one additional (1) 50-foot diameter secondary clarifier tank and mechanism, yard piping, and appurtenances for complete and operational secondary clarifier tank. See attached files.
CityMO
Posted
Oct 30, 2026
Dec 8, 2026
Main replacement and water treatment plant improvements.