Closed

Well Maintenance, Well Rehabilitation, and Capacity Improvement (RFP)

Description: Engineering and water well services for three (3) wells and one (1) well under construction. Phase I: Initial Diagnostic Inspection: Perform down-hole camera inspections, specific capacity testing, and comprehensive water quality testing to establish baselines. Phase II: Well Rehabilitation and Well Capacity Mechanically and chemically clean the aquifer’s natural pores to remove blockages and scale build-up. Disinfect the wells and sanitize the pumps, casings, and surrounding equipment. Phase III: Long-Term Preventive Maintenance Implement a 5-year preventative maintenance plan through 2031, featuring scheduled performance benchmarking, scaling controls, and preventive electrical/mechanical/chemical tune-ups.

Buyer
City of Apalachicola

City · FL, US

Released
Jul 5, 2026
Closes
Aug 3, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts