Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition, clearing, grubbing, sidewalk construction, and pavement work. The work generally consists of, but is not limited to the following: demolition, clearing, grubbing, drainage improvements, concrete flatwork, roadway excavation and grading, roadway paving, and striping. The Work consists of furnishing all materials and equipment necessary to construct a new Granular Activated Carbon treatment system at the existing Well 8 Treatment Facility, in the City. The primary components are generally described as follows: Well 8 Treatment System – demolition and clearing; tree removal; site grading and fencing; concrete driveway; yard piping; chemical enclosure; GAC system; backwash sump and piping; and electrical and control systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work to be performed consists, in general, of rehabilitation of existing well 8, including but not limited to, remove existing pump and appurtenances, well videos, mechanical and chemical cleaning of well and screens, providing and installing temporary pump for pump-to-waste and development, waste water discharge systems and management, installing new pump and appurtenances, disinfection, and other work items.
Posted Date
Jan 13, 2026
Due Date
Jan 27, 2026
Release: Jan 13, 2026
Close: Jan 27, 2026
Work to be performed consists, in general, of rehabilitation of existing well 8, including but not limited to, remove existing pump and appurtenances, well videos, mechanical and chemical cleaning of well and screens, providing and installing temporary pump for pump-to-waste and development, waste water discharge systems and management, installing new pump and appurtenances, disinfection, and other work items.
AvailableProject consists of raising residential structures with piers due to settlement issues.
Posted Date
Jan 19, 2026
Due Date
Feb 9, 2026
Release: Jan 19, 2026
Close: Feb 9, 2026
Project consists of raising residential structures with piers due to settlement issues.
AvailableThis project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
This project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Work includes construction management services and materials testing services, including resident engineer, structures rep, construction engineering, construction inspection, source inspection, materials sampling and testing for a new well and pipeline project.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
Work includes construction management services and materials testing services, including resident engineer, structures rep, construction engineering, construction inspection, source inspection, materials sampling and testing for a new well and pipeline project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis