Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of the Northeast Water Reclamation Facility Deep Injection Well Equipping and Conveyance Project.
Posted Date
Dec 29, 2025
Due Date
Feb 12, 2026
Release: Dec 29, 2025
Close: Feb 12, 2026
Construction of the Northeast Water Reclamation Facility Deep Injection Well Equipping and Conveyance Project.
AvailableProject consists of water reclamation facility deep injection well equipping and conveyance. Work includes approx 2 EA injection well annulus system. See outside link.
Posted Date
Dec 30, 2025
Due Date
Feb 12, 2026
Release: Dec 30, 2025
Close: Feb 12, 2026
Project consists of water reclamation facility deep injection well equipping and conveyance. Work includes approx 2 EA injection well annulus system. See outside link.
AvailableOakdale Irrigation District (OID) seeks construction of a new agricultural groundwater well (OID Howard Deep Well #2) to an approximate depth of 480 feet. The solicitation excludes furnishing and installation of pumping equipment and electrical work, which will be performed by others. Bids must be submitted via PublicPurchase and are due prior to 2:00 pm on Monday, March 9, 2026.
Posted Date
Jan 26, 2026
Due Date
Mar 9, 2026
Release: Jan 26, 2026
Close: Mar 9, 2026
Oakdale Irrigation District (OID) seeks construction of a new agricultural groundwater well (OID Howard Deep Well #2) to an approximate depth of 480 feet. The solicitation excludes furnishing and installation of pumping equipment and electrical work, which will be performed by others. Bids must be submitted via PublicPurchase and are due prior to 2:00 pm on Monday, March 9, 2026.
AvailableThis project consists of the boring and completion of completion of a 570 foot deep public water supply well. the installation of a well pump and related equipment, the construction of a new well building with chemical feed, controls and telemetry and site work at well location site, the installation of approx. 1,650 FT 4" diameter C900 transmission pipeline from the new well building to a new water treatment building, the construction of a new water treatment building with filters, controls, backwash system telemetry equipment at a remote tank site and one existing well site.
Posted Date
-
Due Date
Feb 19, 2026
Release: -
Close: Feb 19, 2026
This project consists of the boring and completion of completion of a 570 foot deep public water supply well. the installation of a well pump and related equipment, the construction of a new well building with chemical feed, controls and telemetry and site work at well location site, the installation of approx. 1,650 FT 4" diameter C900 transmission pipeline from the new well building to a new water treatment building, the construction of a new water treatment building with filters, controls, backwash system telemetry equipment at a remote tank site and one existing well site.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis