Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction management services and materials testing services, including resident engineer, structures rep, construction engineering, construction inspection, source inspection, materials sampling and testing for a new well and pipeline project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of Rural Water System Project – RW1A Pipeline.
Posted Date
Nov 5, 2025
Due Date
Mar 25, 2026
Release: Nov 5, 2025
Close: Mar 25, 2026
Construction of Rural Water System Project – RW1A Pipeline.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes installation of a PFAS filter system and Iron & Manganese filter system at an existing well site (Wyntree) and installation of a pipeline interconnecting two existing water systems (Willow Hill).
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
The project includes installation of a PFAS filter system and Iron & Manganese filter system at an existing well site (Wyntree) and installation of a pipeline interconnecting two existing water systems (Willow Hill).
AvailableThis project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
This project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
AvailableThe North Dakota Department of Water Resources solicits bids for equipment for the Southwest Pipeline Project—Intake Modifications, covering three equipment schedules: vertical turbine pumps and motors, electrical equipment, and valves. The Invitation for Bid requires the supplier to provide equipment, installation, testing, training at no cost to the State, proof of insurance, and a contract bond. Estimated budget range is $500,000–$2,000,000, with bids closing on February 12, 2026.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
The North Dakota Department of Water Resources solicits bids for equipment for the Southwest Pipeline Project—Intake Modifications, covering three equipment schedules: vertical turbine pumps and motors, electrical equipment, and valves. The Invitation for Bid requires the supplier to provide equipment, installation, testing, training at no cost to the State, proof of insurance, and a contract bond. Estimated budget range is $500,000–$2,000,000, with bids closing on February 12, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →