Retrieving RFP details
Release
Close
Eastern New Mexico Water Utility Authority
Construction of Rural Water System Project – RW1A Pipeline.
City of Oklahoma City
Raw water transmission line.
City of Woodbury
Raw water transmission pipeline. Work includes, 5,270 LF of silt fence type ms; 100 CY of temporary construction entrance - rock; 1,875 LF of sediment control log type rock; 10,770 LF of sediment control log type wood fiber; 7,230 LF of sawing bituminous pavement (street or trail or driveway); 25,855 SY of remove bituminous street pavement; 445 SY of remove bituminous trail and driveway pavement; 3,000 sf of remove concrete sidewalk or pedestrian ramp; 9,180 LF of remove concrete curb and gutter; 55 SY of remove concrete driveway pavement; 155 LF of remove 12" rcp storm sewer pipe; 26,875 CY of excavation - common (ev) (p); 34,975 TON of select granular embankment; 3,000 TON of aggregate base, class 5 - temporary use; 3,810 TON of type sp 12. 5 non-wearing course mixture (4,c) - county roads. See outside link.
City of Cortez
Work includes incorporation of a new raw water flow control valve and associated process piping and electrical in the micro hydro power building. The project also includes demolition work and provision / installation of structural support members, grating, and pipe supports.
Release
Nov 05, 2025
Close
Feb 25, 2026