Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If the tech is truly proprietary and essential, build a department-backed justification in parallel.
Coops: Not used today—pivot to reseller or be ready for a competitive bid. As a future option, you can mention OMNIA Partners, Sourcewell, NASPO ValuePoint, or NPPGov.
City: City of Hughson, CA.
Status: Sole source is possible but rare; use only for truly unique, no-competition technology essential to operations.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Hughson's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Mayor
Accounting Manager - Payroll, General Ledger
Chief of Police
City Clerk/Assistant to the City Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Hughson
Work to be performed consists, in general, of rehabilitation of existing well 8, including but not limited to, remove existing pump and appurtenances, well videos, mechanical and chemical cleaning of well and screens, providing and installing temporary pump for pump-to-waste and development, waste water discharge systems and management, installing new pump and appurtenances, disinfection, and other work items.
Posted Date
Jan 13, 2026
Due Date
Jan 27, 2026
Release: Jan 13, 2026
City of Hughson
Close: Jan 27, 2026
Work to be performed consists, in general, of rehabilitation of existing well 8, including but not limited to, remove existing pump and appurtenances, well videos, mechanical and chemical cleaning of well and screens, providing and installing temporary pump for pump-to-waste and development, waste water discharge systems and management, installing new pump and appurtenances, disinfection, and other work items.
AvailableCity of Hughson
Project include 5,570 SF remove existing concrete, 16,517 SF remove existing pavement section, 16,570 SF pavement, 3"AC / 6"AB, 563 LF concrete vertical curb and gutter, 3,546 SF concrete 4" sidewalk, 55,498 SF type II slurry seal, 1 LS signage and striping. See attached file.
Posted Date
-
Due Date
Aug 20, 2025
City of Hughson
Close: Aug 20, 2025
Project include 5,570 SF remove existing concrete, 16,517 SF remove existing pavement section, 16,570 SF pavement, 3"AC / 6"AB, 563 LF concrete vertical curb and gutter, 3,546 SF concrete 4" sidewalk, 55,498 SF type II slurry seal, 1 LS signage and striping. See attached file.
City of Hughson
Demolition, clearing, grubbing, sidewalk construction, and pavement work. The work generally consists of, but is not limited to the following: demolition, clearing, grubbing, drainage improvements, concrete flatwork, roadway excavation and grading, roadway paving, and striping. The Work consists of furnishing all materials and equipment necessary to construct a new Granular Activated Carbon treatment system at the existing Well 8 Treatment Facility, in the City. The primary components are generally described as follows: Well 8 Treatment System – demolition and clearing; tree removal; site grading and fencing; concrete driveway; yard piping; chemical enclosure; GAC system; backwash sump and piping; and electrical and control systems.
Posted Date
Nov 25, 2024
Due Date
Dec 3, 2024
Release: Nov 25, 2024
City of Hughson
Close: Dec 3, 2024
Demolition, clearing, grubbing, sidewalk construction, and pavement work. The work generally consists of, but is not limited to the following: demolition, clearing, grubbing, drainage improvements, concrete flatwork, roadway excavation and grading, roadway paving, and striping. The Work consists of furnishing all materials and equipment necessary to construct a new Granular Activated Carbon treatment system at the existing Well 8 Treatment Facility, in the City. The primary components are generally described as follows: Well 8 Treatment System – demolition and clearing; tree removal; site grading and fencing; concrete driveway; yard piping; chemical enclosure; GAC system; backwash sump and piping; and electrical and control systems.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.