Closing soon

WCCCD NW Campus Office of Event Planning 2026 (Request for Proposals)

Description: Scope of work: Demolition: The project requires the demolition of existing doors, frame assemblies complete, and designated portions of existing drywall partitions. Framing & Walls: New framing construction involves the use of 2 1/2" metal studs and the installation of 5/8" fire-rated gypsum board on both sides. Insulation: Fiberglass insulation must be installed within the stud cavities to provide sound attenuation. Doors & Glazing: The installation requires a 3-hour fire-rated glazing assembly and a 1 3/4" solid core wood door featuring W-rated tempered glazing to match existing facility doors. Door Hardware: The designated door requires a latch handle equipped with an interchangeable cylinder core lock. Flooring: The office space requires laminated vinyl tile flooring with 1/4" padding, specifically manufactured by Patcraft in the style "Natural State 20", color "00150 Driftwood", and laid out in a staggered V1 variation pattern. Finishes: All existing and newly installed gypsum board surfaces within the work area must be painted to match the adjacent surfaces. Baseboards: Vinyl baseboards must be installed to match the existing adjacent baseboards. Signage: The contractor must mechanically attach 2" high, 1/2" thick silver-tone stainless steel signage in Helvetica font that reads "OFFICE OF EVENT PLANNING". Ceiling Utilities: Existing ceiling utilities, including sprinkler heads, light fixtures, and smoke detectors, are to remain in place and must be thoroughly protected throughout the construction process.

Buyer
Released
Jul 17, 2026
Closes
Aug 19, 2026(2 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts