Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of maintenance for process controls and instrumentation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Posted Date
Nov 13, 2025
Due Date
Jan 29, 2026
Release: Nov 13, 2025
Close: Jan 29, 2026
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
AvailableProvide water treatment plant #2 improvements.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
Provide water treatment plant #2 improvements.
AvailableThis project will construct upgrades to the solids handling and solids treatment processes at the existing city of sumner wastewater treatment plant. These improvements will include construct an expansion to the existing solids handling building including: install new indirect biosolids dryer; thermal fluid heaters; and all equipment. Construct temporary haul truck loading bay to facilitate demolition of existing facilities. Modifications to existing treatment systems, structures, and processes will include: replace the existing thickened primary sludge pumps in existing scum pump building, demolition of existing dissolved air floatation thickener, and associated equipment in equipment building 2 and the installation of new rotary drum thickener and associated thickened waste activated sludge pumps, replacement of existing thickening and dewatering polymer systems and replacement of existing air gap system in the existing solids handling building. Reconfigure dewatered sludge conveyance system including rehabilitation of existing dewatered sludge storage hopper, modifications to existing conveyors (temporary and permanent) and installation of new conveyors. Demolish existing waste gas burner and installation of new digester gas treatment system to include hydrogen sulfide and moisture removal and digester gas compression, as well as installation of a new enclosed waste gas flare. Replace existing submersible pumps in plant drain pump station no. 1 and walls of existing centrate storage tank will be raised 6'. Replace internal recycle pumps and anoxic zone mixers in aeration basins 1 and 2. Install new and modify existing electrical power distribution and control equipment to support the new improvements, including installation of new standby generator with subbase fuel tank in a sound attenuating enclosure. Construct new hammerhead on state street just outside entrance to the plant and new security fencing and access gates. Bid additive no. 1 will include the replacement of existing effluent UV disinfection system.
Posted Date
Oct 8, 2025
Due Date
Feb 24, 2026
Release: Oct 8, 2025
Close: Feb 24, 2026
This project will construct upgrades to the solids handling and solids treatment processes at the existing city of sumner wastewater treatment plant. These improvements will include construct an expansion to the existing solids handling building including: install new indirect biosolids dryer; thermal fluid heaters; and all equipment. Construct temporary haul truck loading bay to facilitate demolition of existing facilities. Modifications to existing treatment systems, structures, and processes will include: replace the existing thickened primary sludge pumps in existing scum pump building, demolition of existing dissolved air floatation thickener, and associated equipment in equipment building 2 and the installation of new rotary drum thickener and associated thickened waste activated sludge pumps, replacement of existing thickening and dewatering polymer systems and replacement of existing air gap system in the existing solids handling building. Reconfigure dewatered sludge conveyance system including rehabilitation of existing dewatered sludge storage hopper, modifications to existing conveyors (temporary and permanent) and installation of new conveyors. Demolish existing waste gas burner and installation of new digester gas treatment system to include hydrogen sulfide and moisture removal and digester gas compression, as well as installation of a new enclosed waste gas flare. Replace existing submersible pumps in plant drain pump station no. 1 and walls of existing centrate storage tank will be raised 6'. Replace internal recycle pumps and anoxic zone mixers in aeration basins 1 and 2. Install new and modify existing electrical power distribution and control equipment to support the new improvements, including installation of new standby generator with subbase fuel tank in a sound attenuating enclosure. Construct new hammerhead on state street just outside entrance to the plant and new security fencing and access gates. Bid additive no. 1 will include the replacement of existing effluent UV disinfection system.
AvailableWater Treatment Plant Improvements including controls, process and chemical room upgrades, well improvements, and other miscellaneous items.
Posted Date
Jan 12, 2026
Due Date
Feb 5, 2026
Release: Jan 12, 2026
Close: Feb 5, 2026
Water Treatment Plant Improvements including controls, process and chemical room upgrades, well improvements, and other miscellaneous items.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis