Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct new water treatment plant.
Posted Date
Jan 1, 2026
Due Date
Jan 29, 2026
Release: Jan 1, 2026
Close: Jan 29, 2026
Construct new water treatment plant.
AvailableDesign and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailableWork consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
Posted Date
Nov 7, 2025
Due Date
Feb 3, 2026
Release: Nov 7, 2025
Close: Feb 3, 2026
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
AvailableWork consists of construction of a new 1.3 million gal. per day (mgd) water treatment plant building and infrastructure consisting of site work, aeration/detention/filtration units, ion exchange softening, clearwells, high service pumping, chemical feed facilities, and administration building utilities and associated appurtenances. See outside link.
Posted Date
Nov 13, 2025
Due Date
Jan 16, 2026
Release: Nov 13, 2025
Close: Jan 16, 2026
Work consists of construction of a new 1.3 million gal. per day (mgd) water treatment plant building and infrastructure consisting of site work, aeration/detention/filtration units, ion exchange softening, clearwells, high service pumping, chemical feed facilities, and administration building utilities and associated appurtenances. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis