Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Burnt Cabin Rural Water District
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Village of Ashville
In general, the work consists of construction of a new 1.3 million gallon per day (mgd) water treatment plant building and infrastructure consisting of site work, aeration/detention/filtration units, ion exchange softening, clearwells, high service pumping, chemical feed facilities and administration building, utilities and associated appurtenances.
Posted Date
Nov 13, 2025
Due Date
Jan 16, 2026
Release: Nov 13, 2025
Village of Ashville
Close: Jan 16, 2026
In general, the work consists of construction of a new 1.3 million gallon per day (mgd) water treatment plant building and infrastructure consisting of site work, aeration/detention/filtration units, ion exchange softening, clearwells, high service pumping, chemical feed facilities and administration building, utilities and associated appurtenances.
AvailablePalm Beach County
Provide construction management at risk services consisting of pre-construction services, developing a guaranteed maximum price (gmp), and construction of a 21 mgd membrane plant at water treatment plant no. 2 (wtp2).
Posted Date
Oct 26, 2025
Due Date
Jan 6, 2026
Release: Oct 26, 2025
Palm Beach County
Close: Jan 6, 2026
Provide construction management at risk services consisting of pre-construction services, developing a guaranteed maximum price (gmp), and construction of a 21 mgd membrane plant at water treatment plant no. 2 (wtp2).
AvailableCity of Vinton
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
Posted Date
Oct 10, 2025
Due Date
Dec 11, 2025
Release: Oct 10, 2025
City of Vinton
Close: Dec 11, 2025
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
AvailableMaryland Environmental Service
Construction of new water and wastewater treatment plants, water storage tank, water mains, sewage pump station, sanitary force main, gravity sewer pipes, demolition of the existing wastewater treatment plant, new RV dump station, clearing, inspection/rehabilitation of existing sewer mains, demolition of camp sites and other improvements.
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
Maryland Environmental Service
Close: Dec 15, 2025
Construction of new water and wastewater treatment plants, water storage tank, water mains, sewage pump station, sanitary force main, gravity sewer pipes, demolition of the existing wastewater treatment plant, new RV dump station, clearing, inspection/rehabilitation of existing sewer mains, demolition of camp sites and other improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis