Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Burnt Cabin Rural Water District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Burnt Cabin Rural Water District
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Posted Date
Nov 13, 2025
Due Date
Jan 29, 2026
Release: Nov 13, 2025
Burnt Cabin Rural Water District
Close: Jan 29, 2026
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
AvailableBurnt Cabin Rural Water District
Rehabilitation of a 120,000 Storage Tank (Standpipe).
Posted Date
Jan 2, 2025
Due Date
Jan 23, 2025
Release: Jan 2, 2025
Burnt Cabin Rural Water District
Close: Jan 23, 2025
Rehabilitation of a 120,000 Storage Tank (Standpipe).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.