Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of replacing the existing membrane baffle system and support components and installing a diversion elbow on the influent waterline.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes concrete crack repair 650 lf, concrete spall repair - partial depth 600 sf, concrete spall repair - 600 sf, unsuitable soils replacement 1500 cy, repair for existing expansion joint 500 lf.
Posted Date
Jan 20, 2026
Due Date
Feb 19, 2026
Release: Jan 20, 2026
Close: Feb 19, 2026
Work includes concrete crack repair 650 lf, concrete spall repair - partial depth 600 sf, concrete spall repair - 600 sf, unsuitable soils replacement 1500 cy, repair for existing expansion joint 500 lf.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Corvallis is soliciting sealed proposals from qualified firms to provide engineering consultant services to support repair of a failing clearwell (Clearwell 1) at the Taylor Water Treatment Plant, including structural evaluations, plans and specifications, cost estimating, permitting, bid document production, and construction-phase services. Selection will be done via a Qualifications-Based Selection (QBS) process and the estimated value is approximately $150,000$200,000. The solicitation was posted in mid-January 2026 and the response deadline is February 19, 2026.
Posted Date
Jan 14, 2026
Due Date
Feb 19, 2026
Release: Jan 14, 2026
Close: Feb 19, 2026
The City of Corvallis is soliciting sealed proposals from qualified firms to provide engineering consultant services to support repair of a failing clearwell (Clearwell 1) at the Taylor Water Treatment Plant, including structural evaluations, plans and specifications, cost estimating, permitting, bid document production, and construction-phase services. Selection will be done via a Qualifications-Based Selection (QBS) process and the estimated value is approximately $150,000$200,000. The solicitation was posted in mid-January 2026 and the response deadline is February 19, 2026.
AvailableWork includes replacement of roof on the water treatment plant facility.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Close: Feb 10, 2026
Work includes replacement of roof on the water treatment plant facility.
AvailableWater Treatment Plant Reverse Osmosis Membrane Replacement.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Water Treatment Plant Reverse Osmosis Membrane Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →