Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The elevated storage tank rehabilitation consisting of abrasive blasting, recoating, code related upgrades, two 15,000-gallontemporary hydropneumatics tanks, and adding two logos.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work includes approximately: Water Tower reconditioning, including complete removal and replacement of all exterior and interior wet coating systems, and partial removal and replacement (with spot repairs) of the interior dry coating system. Additional reconditioning will include modifications and repairs related to structural appurtenances, foundations, accessories, and personnel access.
Posted Date
Jan 11, 2026
Due Date
Feb 2, 2026
Release: Jan 11, 2026
Close: Feb 2, 2026
The work includes approximately: Water Tower reconditioning, including complete removal and replacement of all exterior and interior wet coating systems, and partial removal and replacement (with spot repairs) of the interior dry coating system. Additional reconditioning will include modifications and repairs related to structural appurtenances, foundations, accessories, and personnel access.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes Interior Wet Rehabilitation, Exterior Rehabilitation, Miscellaneous grinding, welding, and caulking, New drain “mud” valve and piping, New Aviation Obstruction light and post, Modify upper landing to drain to overflow, New overflow pipe screen, New pressure manway, Minor welding modifications, Repair concrete and grout under cone base ring, New pressure manway gaskets, New recirculation pump, piping, temp sensor, flow indicator, and all new inlet/outlet pipe valves, New safety climb equipment/systems, New concrete splash pad.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
The work includes Interior Wet Rehabilitation, Exterior Rehabilitation, Miscellaneous grinding, welding, and caulking, New drain “mud” valve and piping, New Aviation Obstruction light and post, Modify upper landing to drain to overflow, New overflow pipe screen, New pressure manway, Minor welding modifications, Repair concrete and grout under cone base ring, New pressure manway gaskets, New recirculation pump, piping, temp sensor, flow indicator, and all new inlet/outlet pipe valves, New safety climb equipment/systems, New concrete splash pad.
AvailableProvide Water Tower Inspections and Repair.
Posted Date
Jan 23, 2026
Due Date
Feb 2, 2026
Release: Jan 23, 2026
Close: Feb 2, 2026
Provide Water Tower Inspections and Repair.
AvailableThe Project generally consists of the demolition of the existing water tower and the furnishing of labor, materials and equipment to construct a new 100,000-gal water tower.
Posted Date
Jan 21, 2026
Due Date
Feb 20, 2026
Release: Jan 21, 2026
Close: Feb 20, 2026
The Project generally consists of the demolition of the existing water tower and the furnishing of labor, materials and equipment to construct a new 100,000-gal water tower.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →