Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Bloomingdale's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Bloomingdale
The Project generally consists of the demolition of the existing water tower and the furnishing of labor, materials and equipment to construct a new 100,000-gal water tower.
Posted Date
Jan 21, 2026
Due Date
Feb 20, 2026
Release: Jan 21, 2026
Town of Bloomingdale
Close: Feb 20, 2026
The Project generally consists of the demolition of the existing water tower and the furnishing of labor, materials and equipment to construct a new 100,000-gal water tower.
AvailableTown of Bloomingdale
Project generally consists of a new control system, the installation of actuators for three buried valves, and repairs to the chlorine feed pit. The southern booster station in Town will be rehabilitated with new pipe and fittings, a new pump, and a new hatch and ladder. The booster station located on Annapolis Road will have a new flow meter, flow meter pit, additional equipment and a new standby generator installed. Other work includes the replacement of water meters throughout town and the installation of insert-a-valves in select locations. Work at the wells include replacing cla-valves with check valves and new VFD panels and data radios.
Posted Date
Jan 21, 2026
Due Date
Feb 20, 2026
Release: Jan 21, 2026
Town of Bloomingdale
Close: Feb 20, 2026
Project generally consists of a new control system, the installation of actuators for three buried valves, and repairs to the chlorine feed pit. The southern booster station in Town will be rehabilitated with new pipe and fittings, a new pump, and a new hatch and ladder. The booster station located on Annapolis Road will have a new flow meter, flow meter pit, additional equipment and a new standby generator installed. Other work includes the replacement of water meters throughout town and the installation of insert-a-valves in select locations. Work at the wells include replacing cla-valves with check valves and new VFD panels and data radios.