Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes approximately: Water Tower reconditioning, including complete removal and replacement of all exterior and interior wet coating systems, and partial removal and replacement (with spot repairs) of the interior dry coating system. Additional reconditioning will include modifications and repairs related to structural appurtenances, foundations, accessories, and personnel access.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work includes Interior Wet Rehabilitation, Exterior Rehabilitation, Miscellaneous grinding, welding, and caulking, New drain “mud” valve and piping, New Aviation Obstruction light and post, Modify upper landing to drain to overflow, New overflow pipe screen, New pressure manway, Minor welding modifications, Repair concrete and grout under cone base ring, New pressure manway gaskets, New recirculation pump, piping, temp sensor, flow indicator, and all new inlet/outlet pipe valves, New safety climb equipment/systems, New concrete splash pad.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes Interior Wet Rehabilitation, Exterior Rehabilitation, Miscellaneous grinding, welding, and caulking, New drain “mud” valve and piping, New Aviation Obstruction light and post, Modify upper landing to drain to overflow, New overflow pipe screen, New pressure manway, Minor welding modifications, Repair concrete and grout under cone base ring, New pressure manway gaskets, New recirculation pump, piping, temp sensor, flow indicator, and all new inlet/outlet pipe valves, New safety climb equipment/systems, New concrete splash pad.
AvailableSeeking for lease of a portion of the available space on the existing water tower, and a portion of real property (approx 300 SF) owned by the town.
Posted Date
Jan 18, 2026
Due Date
Feb 12, 2026
Release: Jan 18, 2026
Close: Feb 12, 2026
Seeking for lease of a portion of the available space on the existing water tower, and a portion of real property (approx 300 SF) owned by the town.
AvailableWork includes interior rehabilitation and miscellaneous metal repairs and improvements of a water tank with a two-million-gallon reservoir with a 93-foot diameter and a sidewall height of 40 feet.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Work includes interior rehabilitation and miscellaneous metal repairs and improvements of a water tank with a two-million-gallon reservoir with a 93-foot diameter and a sidewall height of 40 feet.
AvailableThe project consists of improvements to the interior coating system on the existing 250,000 GAL water tower. Also included are other miscellaneous improvements to the tower. See attached file.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
The project consists of improvements to the interior coating system on the existing 250,000 GAL water tower. Also included are other miscellaneous improvements to the tower. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →