Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide professional engineering services to design a new water storage tank & transmission main (tower #5).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
For 16" Water Transmission Main Project.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
For 16" Water Transmission Main Project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Division 1 - Elevated Storage Tank: Furnish all labor, materials, equipment, and incidentals to construct and erect a new 1,000,000 gallon elevated storage tank with 161 feet to high-water-level, including but not limited to the following: mobilization and design, foundation, fabrication and erection, surface preparation and coating, site work and piping, electrical and tank mixing system, and miscellaneous associated work. The Base Bid is for a multi-column tank with a maximum bowl height of 33 feet, Alternate A is for a multi-column tank with a maximum bowl height of 40 feet, and Alternate B is for a pedestal tank.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
Division 1 - Elevated Storage Tank: Furnish all labor, materials, equipment, and incidentals to construct and erect a new 1,000,000 gallon elevated storage tank with 161 feet to high-water-level, including but not limited to the following: mobilization and design, foundation, fabrication and erection, surface preparation and coating, site work and piping, electrical and tank mixing system, and miscellaneous associated work. The Base Bid is for a multi-column tank with a maximum bowl height of 33 feet, Alternate A is for a multi-column tank with a maximum bowl height of 40 feet, and Alternate B is for a pedestal tank.
AvailableDESIGN-BUILD: Design and construct the design-build santa ana canyon road water main extension project.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
DESIGN-BUILD: Design and construct the design-build santa ana canyon road water main extension project.
AvailableThe work for the 1 MG Water Storage Tank Project (Contract 52W-A) consists of the removal of the existing 1 MG water storage tank and its appurtenances on Block 4, Lot 30 and the installation of a new 1 MG water storage tank on Block 4, Lot 1.05.
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
The work for the 1 MG Water Storage Tank Project (Contract 52W-A) consists of the removal of the existing 1 MG water storage tank and its appurtenances on Block 4, Lot 30 and the installation of a new 1 MG water storage tank on Block 4, Lot 1.05.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →