Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
For 16" Water Transmission Main Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of Water Transmission Improvements, specifically +/- 2,318 LF of 30-inch RJ DIP Waterline and one tie-in to an existing 30-inch ductile iron water main.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
Construction of Water Transmission Improvements, specifically +/- 2,318 LF of 30-inch RJ DIP Waterline and one tie-in to an existing 30-inch ductile iron water main.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of approx 2,600 LF of 10", 12", and 16" C900 PVC water transmission pipe, work also includes tie-ins to the existing system and two well sites.
Posted Date
Sep 3, 2025
Due Date
Feb 10, 2026
Release: Sep 3, 2025
Close: Feb 10, 2026
Work includes installation of approx 2,600 LF of 10", 12", and 16" C900 PVC water transmission pipe, work also includes tie-ins to the existing system and two well sites.
AvailableProvide Water System Improvements 16" Transmission Main From Treatment Plant To SH-32 & Water Well No. 3. Work includes Section A: 4,870 LF of 16" PVC C900 DR18 Waterline; 2 Ea. 16" Interconnection; 6 Ea. 16" Butterfly Valve & Box. Section B: 20 VF Drill 20" Diameter Hole; 360 VF Drill 16" Diameter Hole; 360 VF Drill 6" Test Well with Zone Specific Sampling; 200 V.F. 0" O.D. Stainless Steel Screen; 260 VF 10" PVC SDR 17 Certa Lok Well Casing; 21 VF 16" O.D. Steel Surface Casing 1/2" Thick. Section C: 3,555 LF 8" PVC C900 DR18 Waterline; 715 LF 6" PVC C900 DR18 Waterline; 1 Ea. 8" Interconnection; 4 Ea. 8" Gate Valve & Box.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
Provide Water System Improvements 16" Transmission Main From Treatment Plant To SH-32 & Water Well No. 3. Work includes Section A: 4,870 LF of 16" PVC C900 DR18 Waterline; 2 Ea. 16" Interconnection; 6 Ea. 16" Butterfly Valve & Box. Section B: 20 VF Drill 20" Diameter Hole; 360 VF Drill 16" Diameter Hole; 360 VF Drill 6" Test Well with Zone Specific Sampling; 200 V.F. 0" O.D. Stainless Steel Screen; 260 VF 10" PVC SDR 17 Certa Lok Well Casing; 21 VF 16" O.D. Steel Surface Casing 1/2" Thick. Section C: 3,555 LF 8" PVC C900 DR18 Waterline; 715 LF 6" PVC C900 DR18 Waterline; 1 Ea. 8" Interconnection; 4 Ea. 8" Gate Valve & Box.
AvailableApprox 40 LF Directional Drilling for 16" Water Main; 1 EA Adj MH to Grade; 1 EA Reducer, MJ, 8" X 6"; 1 EA Reducer, MJ, 12" X 6"; etc. See outside link.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
Approx 40 LF Directional Drilling for 16" Water Main; 1 EA Adj MH to Grade; 1 EA Reducer, MJ, 8" X 6"; 1 EA Reducer, MJ, 12" X 6"; etc. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →