Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Water System Improvements 16" Transmission Main From Treatment Plant To SH-32 & Water Well No. 3. Work includes Section A: 4,870 LF of 16" PVC C900 DR18 Waterline; 2 Ea. 16" Interconnection; 6 Ea. 16" Butterfly Valve & Box. Section B: 20 VF Drill 20" Diameter Hole; 360 VF Drill 16" Diameter Hole; 360 VF Drill 6" Test Well with Zone Specific Sampling; 200 V.F. 0" O.D. Stainless Steel Screen; 260 VF 10" PVC SDR 17 Certa Lok Well Casing; 21 VF 16" O.D. Steel Surface Casing 1/2" Thick. Section C: 3,555 LF 8" PVC C900 DR18 Waterline; 715 LF 6" PVC C900 DR18 Waterline; 1 Ea. 8" Interconnection; 4 Ea. 8" Gate Valve & Box.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
For 16" Water Transmission Main Project.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
For 16" Water Transmission Main Project.
AvailableProcurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
AvailableProject consists of replacing the existing main filter plant including ground storage reservoirs and booster pump station with water treatment plant 1 located at a new site. The project consists of turning well 9 site into water treatment plant 2. The project consists of work at the main filter plant site, water treatment plant 1 site, water treatment plant 2 site, well 4 site, well 5 site, well 8 site, well 9 site, and well 10 site. The work at the main filter plant site includes demolishing two ground storage reservoirs, main booster pump station, maintenance shop, and well 4 building.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
Project consists of replacing the existing main filter plant including ground storage reservoirs and booster pump station with water treatment plant 1 located at a new site. The project consists of turning well 9 site into water treatment plant 2. The project consists of work at the main filter plant site, water treatment plant 1 site, water treatment plant 2 site, well 4 site, well 5 site, well 8 site, well 9 site, and well 10 site. The work at the main filter plant site includes demolishing two ground storage reservoirs, main booster pump station, maintenance shop, and well 4 building.
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Posted Date
Nov 6, 2025
Due Date
Jan 15, 2026
Release: Nov 6, 2025
Close: Jan 15, 2026
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis