Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work for the 1 MG Water Storage Tank Project (Contract 52W-A) consists of the removal of the existing 1 MG water storage tank and its appurtenances on Block 4, Lot 30 and the installation of a new 1 MG water storage tank on Block 4, Lot 1.05.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Posted Date
Nov 19, 2025
Due Date
Jan 9, 2026
Release: Nov 19, 2025
Close: Jan 9, 2026
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacing the current 1.5 mg standpipe welded steel water storage tank.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Work includes replacing the current 1.5 mg standpipe welded steel water storage tank.
AvailableRelease: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailableThis project generally consists of the rehabilitation of potable water storage high tank and ground reservoir, painting, steel repairs, reservoir roof replacement, electrical and SCADA modifications; and all other related appurtenances and accessories necessary to complete the Work.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
This project generally consists of the rehabilitation of potable water storage high tank and ground reservoir, painting, steel repairs, reservoir roof replacement, electrical and SCADA modifications; and all other related appurtenances and accessories necessary to complete the Work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →