Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Middlesex
Elevated water storage tank.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Anne Arundel County
Work includes construction of a 2,000,000 gal composite or steel elevated water storage tank (EWST) and associated site improvements, grading, concrete, paving, maintenance of traffic, erosion and sediment control, electrical, instrumentation, and approx. 2,800 LF of 16" dia ductile iron water mains.
Posted Date
Dec 3, 2025
Due Date
Jan 20, 2026
Release: Dec 3, 2025
Anne Arundel County
Close: Jan 20, 2026
Work includes construction of a 2,000,000 gal composite or steel elevated water storage tank (EWST) and associated site improvements, grading, concrete, paving, maintenance of traffic, erosion and sediment control, electrical, instrumentation, and approx. 2,800 LF of 16" dia ductile iron water mains.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of North Chicago
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Posted Date
Nov 19, 2025
Due Date
Jan 9, 2026
Release: Nov 19, 2025
City of North Chicago
Close: Jan 9, 2026
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
AvailableNew Kent County
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
New Kent County
Close: Jan 15, 2026
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
AvailableCity of High Point
Work includes of demolition of the elevated storage water tank and site appurtenances. The elevated water storage tank is a 1,000,000 gallon (1mg)) capacity tank that is no longer in use. It consists of a welded steel tank and steel frame.
Posted Date
Nov 3, 2025
Due Date
Dec 10, 2025
Release: Nov 3, 2025
City of High Point
Close: Dec 10, 2025
Work includes of demolition of the elevated storage water tank and site appurtenances. The elevated water storage tank is a 1,000,000 gallon (1mg)) capacity tank that is no longer in use. It consists of a welded steel tank and steel frame.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →