Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of High Point
Work includes of demolition of the elevated storage water tank and site appurtenances. The elevated water storage tank is a 1,000,000 gallon (1mg)) capacity tank that is no longer in use. It consists of a welded steel tank and steel frame.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Breese
Project includes the following work: installation of a new 300,000 - Gallon single pedestal elevated water storage tank.
Posted Date
Oct 12, 2025
Due Date
Dec 3, 2025
Release: Oct 12, 2025
City of Breese
Close: Dec 3, 2025
Project includes the following work: installation of a new 300,000 - Gallon single pedestal elevated water storage tank.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Twiggs County
Provide 200,000 gallon elevated water storage tank.
Posted Date
Oct 28, 2025
Due Date
Dec 2, 2025
Release: Oct 28, 2025
Twiggs County
Close: Dec 2, 2025
Provide 200,000 gallon elevated water storage tank.
AvailableCity of Cocoa
The work includes surface preparation, corrosion repair, and coating of metal surfaces of the City of Cocoa 1.5 MG Elevated Water Storage Tank. The Contractor scope of work also includes rehabilitation of tank equipment such as vents, ladders, and structural supports
Posted Date
Nov 10, 2025
Due Date
Dec 19, 2025
Release: Nov 10, 2025
City of Cocoa
Close: Dec 19, 2025
The work includes surface preparation, corrosion repair, and coating of metal surfaces of the City of Cocoa 1.5 MG Elevated Water Storage Tank. The Contractor scope of work also includes rehabilitation of tank equipment such as vents, ladders, and structural supports
AvailableCity of Sugar Land
The City of Sugar Land seeks bids to rehabilitate an elevated storage tank, including blasting and recoating the tank interior and exterior, replacing valves, adding a recirculating pump with electrical and SCADA integration, and performing associated piping, concrete, and site improvements. A non‑mandatory pre‑bid meeting and site visit are scheduled, and bids are due electronically by 11:00 AM CT on December 18, 2025.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
City of Sugar Land
Close: Dec 18, 2025
The City of Sugar Land seeks bids to rehabilitate an elevated storage tank, including blasting and recoating the tank interior and exterior, replacing valves, adding a recirculating pump with electrical and SCADA integration, and performing associated piping, concrete, and site improvements. A non‑mandatory pre‑bid meeting and site visit are scheduled, and bids are due electronically by 11:00 AM CT on December 18, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →