Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a 2,000,000 gal composite or steel elevated water storage tank (EWST) and associated site improvements, grading, concrete, paving, maintenance of traffic, erosion and sediment control, electrical, instrumentation, and approx. 2,800 LF of 16" dia ductile iron water mains.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailablePremium
Access the largest public sector contact database
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
AvailableWork includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Posted Date
Nov 19, 2025
Due Date
Jan 9, 2026
Release: Nov 19, 2025
Close: Jan 9, 2026
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
AvailableProject includes Contract A - Elevated Storage Tank Work (Lump Sum). Work for Contract A consists of construction of a 500,000-gallon single pedestal spheroid elevated storage tank, site work, and associated work.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Project includes Contract A - Elevated Storage Tank Work (Lump Sum). Work for Contract A consists of construction of a 500,000-gallon single pedestal spheroid elevated storage tank, site work, and associated work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis