Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 5 CY rock excavation; 6 EA fire hydrant with storz connections; 2,850 LF of 4" temporary water main; 1,200 LF of 8" clean and line cast iron water main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes one-year term contract, with two, one-year renewal options from qualified contractors to provide CIPP lining of Water Mains throughout various areas of the Water System. The work shall consist of cleaning the existing water pipe, consist of constructing cured-in-place pipe (CIPP) water main lining of existing 6, 8, 10, 12, 16 and 24" water main and providing temporary water main service as required for the placement of the water main liner.
Posted Date
Jan 26, 2026
Due Date
Feb 9, 2026
Release: Jan 26, 2026
Close: Feb 9, 2026
Project includes one-year term contract, with two, one-year renewal options from qualified contractors to provide CIPP lining of Water Mains throughout various areas of the Water System. The work shall consist of cleaning the existing water pipe, consist of constructing cured-in-place pipe (CIPP) water main lining of existing 6, 8, 10, 12, 16 and 24" water main and providing temporary water main service as required for the placement of the water main liner.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Miami Beach is seeking professional services for force main subaqueous lining repair.
Posted Date
-
Due Date
Feb 26, 2026
Close: Feb 26, 2026
The City of Miami Beach is seeking professional services for force main subaqueous lining repair.
AvailableReplace trapezoidal HDPE lining with geosynthetic cementious composite matt (GCCM) lining; Reduce demolition of existing ditch lining.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
Replace trapezoidal HDPE lining with geosynthetic cementious composite matt (GCCM) lining; Reduce demolition of existing ditch lining.
AvailableWastewater Pump Station No. 30 (hereafter PS 30) is a submersible type station located on Terminal Island. PS 30 discharges to Pump Station No. 2 (hereafter PS 2) located on Star Island, via approximately 3,300 linear feet of 10-inch ductile iron (hereafter DI) force main.
Posted Date
-
Due Date
Feb 26, 2026
Close: Feb 26, 2026
Wastewater Pump Station No. 30 (hereafter PS 30) is a submersible type station located on Terminal Island. PS 30 discharges to Pump Station No. 2 (hereafter PS 2) located on Star Island, via approximately 3,300 linear feet of 10-inch ductile iron (hereafter DI) force main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →