Mary Ann's Water Main Extension Project
Water Main Extension Project is adjacent to East Second Street and Harris Drive within the City of Webster City. The project consists of approximately 840 LF of 8” PVC trenched water main with fittings; 109 LF of 8” PVC trenchless water main with steel casing; 1 each 1-inch water service; 2 each fire hydrants; 51 LF of 15-inch diameter CMP trenched culvert pipe; 2 each 15-inch diameter CMP pipe aprons; 19 SY of 7-inch thick PCC driveway pavement; 32 tons of 8-inch thick driveway gravel; temporary traffic control; erosion control and seeding; and various related removals and improvements.