Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Molalla
Provide and install a new 100-hp vertical turbine pump assembly in place of existing 75-hp vertical turbine pump.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Umatilla
Project proposes the construction of a new raw river water intake pump station/POD, and the portion of the new raw water transmission main on USACE property conveying raw water to the new WTF. Also included is the installation of fiber optic cables from the POD to the WTF within conduit installed as part of this project, as part of the pipeline construction project, and as part of the WTF construction contract. The major components of the project include: 1.Construction of a pump station (POD) including pumps, fish screens, a hydropneumatic surge tank, 2.Construction of approximately 340 feet of 30-inch and 36-inch diameter pipeline from the pump station to the property line, and 3.Demolition of the existing CTUIR pump station and pipeline. Adjacent projects designed by others will be constructed in tandem with this project, coordination of construction schedules and scope connections will be required.
Posted Date
Oct 28, 2025
Due Date
Dec 4, 2025
Release: Oct 28, 2025
City of Umatilla
Close: Dec 4, 2025
Project proposes the construction of a new raw river water intake pump station/POD, and the portion of the new raw water transmission main on USACE property conveying raw water to the new WTF. Also included is the installation of fiber optic cables from the POD to the WTF within conduit installed as part of this project, as part of the pipeline construction project, and as part of the WTF construction contract. The major components of the project include: 1.Construction of a pump station (POD) including pumps, fish screens, a hydropneumatic surge tank, 2.Construction of approximately 340 feet of 30-inch and 36-inch diameter pipeline from the pump station to the property line, and 3.Demolition of the existing CTUIR pump station and pipeline. Adjacent projects designed by others will be constructed in tandem with this project, coordination of construction schedules and scope connections will be required.
AvailableCity of Newport News
Pump station pump replacement
Posted Date
Oct 29, 2025
Due Date
Nov 25, 2025
Release: Oct 29, 2025
City of Newport News
Close: Nov 25, 2025
Pump station pump replacement
AvailableCity of Durango
Generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future city use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station
Posted Date
Jul 2, 2025
Due Date
Dec 9, 2025
Release: Jul 2, 2025
City of Durango
Close: Dec 9, 2025
Generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future city use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station
AvailableEwing-Lawrence Sewerage Authority
Replacement of an existing raw sewage pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Ewing-Lawrence Sewerage Authority
Close: Jan 6, 2026
Replacement of an existing raw sewage pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis