Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of water well pump replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the construction of water well pump replacement in Yazoo County.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
This RFP is for the construction of water well pump replacement in Yazoo County.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide on-call water well and well pump maintenance services on any of authority's 13 wells and associated pumps. Services may include, but are not limited to: well pump removal and installation, removal, repair and maintenance of well appurtenances, well pump teardown, inspection and recommended repairs, motor teardown, inspection and recommended repairs, well rehabilitation with physical and/or chemical cleaning, downhole video inspection, emergency repair services.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
Provide on-call water well and well pump maintenance services on any of authority's 13 wells and associated pumps. Services may include, but are not limited to: well pump removal and installation, removal, repair and maintenance of well appurtenances, well pump teardown, inspection and recommended repairs, motor teardown, inspection and recommended repairs, well rehabilitation with physical and/or chemical cleaning, downhole video inspection, emergency repair services.
AvailableProject will entail executing the following tasks on all three (3) well water pumps at TCEC: 1. Remove the existing above ground well water piping and equipment and store the designated parts for reuse. 2. Fabricate new well water piping and set aside to be coated. Supplier will be responsible for supplying pipe, fittings, bolting, and u-bolts. Coating to be handled by FMPA. 3. Install new piping and equipment without damaging coating. 4. Demo and installation work will be performed one well at a time so as not to impede operations or fire protection
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Project will entail executing the following tasks on all three (3) well water pumps at TCEC: 1. Remove the existing above ground well water piping and equipment and store the designated parts for reuse. 2. Fabricate new well water piping and set aside to be coated. Supplier will be responsible for supplying pipe, fittings, bolting, and u-bolts. Coating to be handled by FMPA. 3. Install new piping and equipment without damaging coating. 4. Demo and installation work will be performed one well at a time so as not to impede operations or fire protection
AvailableThe Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
The Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →