Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailablePremium
Access the largest public sector contact database
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableWork includes construction of a new pumping station, including a new wet well, raw sewage pumps, pump controls, and all other appurtenances, as well as the installation of a valve and metering vault, emergency generator, and telemetry equipment. Project also includes the selective demolition of existing pump station equipment. Also included is the replacement of approx 1,500 LF of force main with new 4" pipe.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Work includes construction of a new pumping station, including a new wet well, raw sewage pumps, pump controls, and all other appurtenances, as well as the installation of a valve and metering vault, emergency generator, and telemetry equipment. Project also includes the selective demolition of existing pump station equipment. Also included is the replacement of approx 1,500 LF of force main with new 4" pipe.
AvailableWork includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.