Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Schellsburg Municipal (Sewer) Authority
Work includes construction of a new pumping station, including a new wet well, raw sewage pumps, pump controls, and all other appurtenances, as well as the installation of a valve and metering vault, emergency generator, and telemetry equipment. Project also includes the selective demolition of existing pump station equipment. Also included is the replacement of approx 1,500 LF of force main with new 4" pipe.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Newport News
Pump station pump replacement
Posted Date
Oct 29, 2025
Due Date
Nov 25, 2025
Release: Oct 29, 2025
City of Newport News
Close: Nov 25, 2025
Pump station pump replacement
AvailableEwing-Lawrence Sewerage Authority
Replacement of an existing raw sewage pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Ewing-Lawrence Sewerage Authority
Close: Jan 6, 2026
Replacement of an existing raw sewage pump station.
AvailableCity of Durango
Generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future city use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station
Posted Date
Jul 2, 2025
Due Date
Dec 9, 2025
Release: Jul 2, 2025
City of Durango
Close: Dec 9, 2025
Generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future city use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station
AvailableCity of Raleigh
The Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
Posted Date
Oct 17, 2025
Due Date
Dec 4, 2025
Release: Oct 17, 2025
City of Raleigh
Close: Dec 4, 2025
The Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis